Good day! Assembled a SP 14 Moon Phase clock this weekend. The process was lovely and smooth when following the documentation, but I don't see where the documentation mentioned adding spacer 7a to the 3mm shaft that the ratchet rides on. This component doesn't seem to be mentioned when assembling the ratchet. The diagram on page 37 doesn't show the component, either. I did figure it out after working on the clock; wanted to let you know.
top of page
bottom of page
I asked this in my moon phase clock build thread. Spacer 7a does go under Gear 7. In Steve's answer, he said it could go either top hat up or top hat down, either way. I chose to go top hat up, against the gear.
Thanks for pointing this out. The manuals have so much detail that copy and paste errors or omissions will sometimes creep in. There may be a minor revision to the Moon Phase Clock soon and I will make sure to update the manual.